Project Name: Bridgewater High School Sector: Education Location: Warrington Client: E3 Cube M&E Contract Value: £1,200,000

Bridgewater High School is a coeducational secondary school for pupils aged 11 to 16, located over two sites in Appleton, Warrington, Cheshire.

As part of the project, the teaching facilities at the upper site are to be expanded through the creation of additional new classrooms in line with the curriculum model. This is in order to allow the site to accommodate the year 9 pupils who will no longer be taught at the lower school site.

All works are to be carried out while the school is fully occupied, and close liaison will be required with the client and design team to ensure works are suitably phased to avoid disruption.

The scheme is due for completion in September 2022.